Concrete

You have about forty-five minutes. Make them count.

Overview

Concrete is the material of foundations, slabs, footings, and everything else a building pushes against. It is unlike most materials in that it has a clock. Once the truck arrives, you have a window. The window closes. There is no rescheduling with set concrete.[1]

The Pour

  • Forms before concrete. The form is the shape. Get the form right or get it wrong for 50 years.
  • Rebar before pour. Tensile strength comes from steel. Concrete alone is strong in compression only.
  • The slump is the slump. Don't add water to make it easier. Ever.
  • Screed, float, trowel. In that order. Patience between each.
  • Control joints are not optional. Concrete cracks. The only question is where. You decide where.
  • Cure it. The first 72 hours matter.

Software Parallel

Concrete is the closest construction analog to a database migration. Once it runs, the shape is set. You can chip away at it. You cannot move it. Plan the migration the way you'd plan a pour: forms (schema), rebar (indexes), control joints (feature flags), and curing (a post-migration soak time where you do not touch anything).

"Everyone remembers their first bad pour. It is also usually their last." — Burbridge